Hawera Substation

Safeguarding Hawera Substation with Expert Asbestos Remediation

Advanced Environmental Services (AES) was engaged by Downer NZ to manage the remediation of cable trenches at the Hawera Substation, overcoming the challenges of asbestos contamination and live power lines to complete the project safely, on time, and on budget.

Fast Facts

Customer: Downer NZ

Location: Hawera, New Zealand

Duration: 3 Weeks

Value: $120k+
Scope: Asbestos Removal

Overview

AES was engaged directly by Downer NZ to undertake the remediation of cable trenches within the substation control room, which had been cross-contaminated during storms. The trenches, filled with silt and dust from historic flooding, needed to be cleared for the installation of new cables. Despite the complex nature of the project, AES ensured that the remediation was completed safely and efficiently, without disrupting the operations of the substation.

Key Challenges

  • Live Power Lines: Remediation work had to be completed with live power in the trenches, requiring extreme care and specialised techniques to ensure worker safety.

  • Severe Contamination: The trenches were heavily contaminated with asbestos and other debris, demanding a high level of control and precision during removal.

  • Access and Safety: Constructing a removal enclosure within the control room that allowed for safe cleaning while maintaining access to critical control panels was a logistical challenge.

Solutions & Innovations

  • Collaborative Design: AES worked closely with on-site staff to design a custom removal enclosure that allowed for safe and efficient cleaning of the trenches while ensuring access to critical equipment.

  • Live Power Safety: Adapting traditional wet removal methods to safely work around the live high-voltage power, ensuring the safety of the team during all stages of the project.

  • Adaptive Planning: AES’s ability to quickly adapt and adjust plans in response to site conditions ensured minimal disruption and smooth project execution.

Outcome

AES successfully completed the remediation project on time and within budget, allowing for the safe installation of new cables by other contractors. The job showcased AES's ability to effectively handle complex asbestos removal in a live, high-risk environment, highlighting the team's commitment to safety, innovation, and client satisfaction.